Inventory · Installation
Looking to check inventory or schedule an installation?
Please include the product name and SKU in your inquiry to help us verify stock, lead time, equipment compatibility, and installation arrangements. Please provide your existing equipment model or usage environment so we can offer more accurate recommendations.
Schneider Charge Basic Installation Service | Product Information
Scope of Basic Installation Service
* Dedicated online consultation service
* Installation by certified electricians
* Issuance of Certificate of Completion upon finishing
* Supply and installation of 2M (6mm) cable from the isolator switch to the EV charger (isolator switch to be provided by the end-user)
Under normal circumstances, on-site installation service will be arranged within 2-3 weeks upon request (installation works initiated by the end-user must obtain prior consent from the property management office). In extreme weather conditions, installation arrangements may be extended and rescheduled. Installation service should be scheduled and completed within 6 months from the date of the sales invoice.
Notes
1. If additional installation services are required, details will be quoted separately based on the actual on-site conditions.
2. Rescheduling the installation date or time (if failure to notify at least two working days in advance): $500.
3. Remote area surcharges: (I): Tung Chung/Sunny Bay/Park Island/Ma Wan HK$200; (II): Discovery Bay/Peng Chau/Cheung Chau/Lamma Island/Pui O/Penny's Bay/Sha Tau Kok (restricted area) HK$300; (III): Mui Wo/Tai O/Ngong Ping/Sea Crest Villa/Shek Kwu Chau/Hei Ling Chau/Sunshine Island/Tung Lung Chau HK$400.